Custom Packaging from Idea to Delivery: The 10-Step Production Process

Published Sep 21, 2026 · Updated Sep 2026 · LUXPCK Editorial Team
Custom Packaging from Idea to Delivery: The 10-Step Production Process

Most packaging delays are not caused by machines — they are caused by buyers not knowing what stage their order is in. Here is the exact 10-step process every LUXPCK order goes through, so you always know what happens next.

Steps 1–3: Engineering the box

Before any of this, the design is locked with 3D digital proofing — you approve a photorealistic model, not a hand sketch. Physical sampling then takes about 15 days, with 2 rounds of revisions included.

Steps 4–7: Building the finish

Steps 8–10: Assembly and control

The commercial timeline

SamplingAbout 15 days — 3D digital proofing, 2 revisions included
ProductionAbout 30 days after order confirmation
PaymentT/T — 30% deposit, 70% balance before shipment
ShippingEXW / FOB Guangzhou · express via DHL, FedEx, UPS
ArtworkAI, C4D, PDF

Every step above runs in our own factory — woodworking, paint processing, packaging assembly and handmade leatherwork. See the capabilities on custom packaging boxes and wooden boxes, or the service scope on our service page.

Sampling takes about 15 days including 3D digital proofing and 2 rounds of revisions; production lead time is about 30 days after order confirmation.

AI, C4D or PDF files. If you only have a sketch or reference photo, our design team can develop the drawing with you.

Yes — every process is inspected before moving to the next, and third-party inspection such as SGS is accepted before shipment.

T/T with 30% deposit and 70% balance before shipment.